What to measure on a roof, and what each number is for
Every field on the roofing measurement report, and why it's there.
7 min read
Every number on a roofing measurement report exists because something downstream needs it. Here is what each one is, and which line on the estimate it drives.
| Measurement | What it is | What it drives |
|---|---|---|
| Squares | Roof area in 100 sq ft units | Shingles, underlayment, tear-off, labor |
| Eaves | Horizontal bottom edges | Drip edge, starter, ice & water, gutters |
| Rakes | Sloped edges at the gable ends | Drip edge, starter |
| Ridges | Horizontal peaks | Ridge cap, ridge vent |
| Hips | Sloped external corners | Ridge cap |
| Valleys | Sloped internal corners where planes meet | Ice & water, valley metal |
| Pitch | Rise over 12 inches of run | Labor rate, steep-slope charges, walkability |
| Waste % | Allowance for offcuts | Only the materials you cut |
The three that get missed
Rakes and eaves are not the same edge. Both take drip edge, so they add together for that line — but only eaves take gutters, and only eaves take the first course of ice and water. Lump them together and you'll over-order one and under-order the other.
Ridges and hips both take cap, so for that line they add up. But only ridges take ridge vent. Same trap, opposite direction.
Pitch changes the price, not the quantity. A 12/12 roof has the same squares as an 8/12 of the same footprint, but it is slower, needs staging, and is more dangerous. That belongs in the labor rate, not in a fudged square count.
Waste isn't one number
A simple gable roof runs around 10%. Cut-up roofs with lots of valleys and hips run 15% or more, because every valley means cutting shingles at an angle and binning the offcut. Straight runs of drip edge and pipe boots waste nothing.
That is why waste is set per line on the package rather than once per job — see how packages work.
Measured from a report or from the roof
A measurement report from an aerial provider gives you these numbers without getting on a ladder, and you can attach the original PDF to the job so the crew and the office are looking at the same document. Measuring by hand gives you the same fields — the estimate doesn't care where the numbers came from, only that they're right.
Either way, enter them once. Everything after that is arithmetic, and arithmetic is what software is for.
Keep reading
How a package turns measurements into a materials list
The one concept that makes the rest of the estimate build itself. Read this first.
Why Good, Better, Best closes more jobs
The pricing structure, and why three tiers cost almost nothing to offer.
What to measure for siding, and what each number is for
Wall area, openings, corners and trim — and the deduction rule that trips people up.
What to measure for gutters, and what each number is for
A short list, taken from the ground, that prices a job on the spot.
What to measure for window replacement
Why a window job is a list of openings, not an area — and what breaks when it's wrong.
What to measure for a deck build
Area, railing, stairs, footings — and why framing drives more cost than decking.
What to measure for a fence install
Linear feet is the headline; post count is what you actually pay for.